Our commercial construction projects have included office buildings, warehouses, car dealerships and commercial retail units (CRU’s). We construct to suit the requirements of our clients and the marketplace. These projects are typically non-combustible construction with a structural steel skeleton.
Canbian Inc. was the successful contractor to be awarded the Glenridding Commercial project. This project is a two storey commercial building, main floor is 21,317 square feet, second floor is 14,614 square feet. The building’s structure is comprised of a structural steel skeleton with metal roof deck and steel stud walls. Exterior finishes include masonry, EIFS, and metal cladding. Roofing is a mix of SBS roofing for the second floor patio areas and EPDM roofing for the remainder. Anticipated completion is scheduled for October 2020.
Location | Edmonton, AB |
Type | CCDC#2 / Tender |
Size | 35,931 square feet |
Duration | 12 Months |
Canbian has been retained as the General Contractor for the Elves Society Building Addition and Renovations. Construction started in August 2018 with the demolition of a portion of the existing building to make way for the new addition. The existing building foundations needed to be underpinned and supported before construction of the new basement could commence. The new addition is made of reinforced concrete footings and concrete walls, structure steel columns, beams, OWSJ and metal floor and roof deck. Completion is slated for end of August 2019.
Location | Edmonton, AB |
Type | Institutional / Tender |
Size | 11,000 square feet |
Duration | 12 months |
Canbian Inc. is the construction manager for this project which consists of three new CRU buildings located on the same site. The buildings’ footprints range from 10,225 square feet to 3,892 square feet. The foundations for all three buildings will consist of engineered steel screw piles, concrete grade beams and a slab on grade. The buildings are conventional structural steel with EIFS, stone and metal cladding on steel stud / gypsum board walls. An EPDM roofing membrane completes the building’s envelope. The lot will also include a public amenity fountain. Construction commenced in October 2018 and completion is expected for October 2019.
Location | Edmonton, AB |
Type | Construction Management |
Size | Building A: 10,225 sqft Building B: 4,192 sqft Building C: 3,892 sqft |
Duration | 12 months |
The Jasper Place Square building is designed as a 2-story CRU building with a daycare on the second floor with a rooftop outdoor play area. The foundation is a grade bream system resting on end bearing piles. The Structure of the building consist of steel columns, beams, and joists. The 2nd floor is a 5” concrete slab over metal floor deck. The roof is an EPDM system. Exterior finishes include EIFS, cultured Stone, aluminum doors and glazing system and a wooden trellis. Anticipated completion is first week of July 2019.
Location | Edmonton, AB |
Type | Construction Managers |
Size | 14,240 square feet |
Duration | 6 months |
Canbian is the construction manager for this 8000 square feet commercial retail project. The building is conventional structural steel with EIFS and metal cladding on steel stud / gypsum board walls. The lot was previously a service station which has now required a structural concrete slab on grade main floor. Construction completion is expected for June 2019.
Location | Edmonton, AB |
Type | Construction Management |
Size | 8000 square feet |
Duration | 10 months |
Canbian Inc. is the construction manager on the Silverberry project. This project is a two storey commercial building, main floor 18,000 square feet, second floor 10,600 square feet. Exterior finishes include masonry, EIFS and metal cladding, roofing is ballasted 60 mil EPDM. The structure is steel stud on structural steel, concrete grade beam on screw piles. The land usage and building location is affected by the utility easement along the east side of the property.
Location | Edmonton, AB |
Type | Construction Management |
Size | 28,600 square feet |
Duration | 12 months |
Canbian has been retained as the General Contractor for this single storey commercial carwash and CRU development totalling 13,300sqft in Fort Saskatchewan. Construction started on August 1st, 2018 and is anticipated to be completed for March 30th, 2019. Building composition is made up of ICF concrete foundations which support the insulated precast concrete wall panels. The roof structure consists OWSJ’s & metal deck that support the EPDM roof.
Location | Fort Saskatchewan, AB |
Type | Design Build |
Size | 13,300 square feet |
Duration | 7 months |
This project consists of the complete construction of 3 commercial buildings in Sherwood Park (58,232ft2). Foundations will consist of concrete piles & gradebeams with a concrete slab on grade. The building’s structures are comprised of a structural steel skeleton with a metal roof deck. Exterior finishes include: Aluminum windows, EIFS, masonry block, metal panels and an EPDM roof. Anticipated completion is scheduled for October 2019.
Location | Sherwood Park, AB |
Type | Design Build |
Size | 58,232 square feet |
Duration | 14 months |
This project consists of a single storey, 7,760 SF commercial retail building in Edmonton. Foundations will be screw piles and concrete gradebeams with a structural concrete slab. The building’s structure is comprised of a structural steel skeleton with a metal roof deck. Exterior finishes include: EIFS, masonry block, and an EPDM roof. Construction started in November 2017. Anticipated completion is July, 2018. Prior to construction commencing, environmental soil remediation was completed.
Location | Edmonton, AB |
Type | Construction Management |
Size | 7,760 square feet |
Duration | 8 months |
One storey 13,250 SF commercial retail building in Edmonton. Foundations will be concrete piles and gradebeam with a slab on grade. The building will be structural steel frame with a metal roof deck. There are 3 feature wood frame peaked roofs on the front elevation. Exterior finishes include: EIFS, Hardie board, Cultured stone and masonry block. Each peaked roof will have an exposed truss held up by 2 columns clad in cultured stone. Roofing is EPDM with shingles on the sloped roof. Construction is scheduled to start in November 2017. Anticipated completion is August 2018.
Location | Edmonton, AB |
Type | N/A |
Size | 13,250 square feet |
Duration | 11 months |
This project consists of a new hotel and a separate CRU Commercial building on the same site. The hotel is approximately 43,200 sqft in total with 92 suites over four floors as well as an indoor pool. The building is primarily a wood structure sitting on top of a concrete foundation. The exterior finishes consists largely of EFIS stucco along with a TPO membrane roof. The commercial building has a 10,000 sqft foot print comprised of a conventional steel frame structure and grade beam foundation. This building features aluminum windows, EFIS stucco and masonry exterior finishes.
Location | Edmonton, AB |
Type | Construction Managers |
Size | Hotel 43,200 sqft CRU 10,000 sqft |
Duration | 18 months |
Canbian has been selected to be the General Contractor for this south Edmonton single storey commercial carwash development totalling 14,035sqft. Construction started on August 21st and is anticipated to be completed for February 28th, 2018. Building composition is made up of cast in place concrete strip footings and foundation walls which support the Conform Stay-in-Place concrete wall forming system (by NuForm). The roof structure consists of precast concrete Hollow-core and Double-tee members with a EPDM roof membrane. Interior finishes included Reline panels (by NuForm), painted drywall, t-bar ceilings, exposed Hollow-core and Double-tee’s, and a concrete slab on grade.
Location | Edmonton, AB |
Type | Competitive Tender / Lump Sum Contract |
Size | 14,035 square feet |
Duration | 6 months |
Two storey commercial building with retail on the main floor (18,830 SF) and a Dentist and Daycare on the second (9,809 SF). Structural steel frame building on concrete piles and gradebeam. Main floor will be a concrete slab on grade. Second floor will be concrete topping on metal deck. Exterior finishes include EIFS, masonry veneer, Hardie Board siding and AL-13 panels. Roofing will be EPDM. Phase 1 sitework to include two new commercial crossings, paving, curbs and sidewalks for Building A. Base Building to be completed in December 2017.
Location | Edmonton, AB |
Type | Competitive Tender / Lump Sum Contract |
Size | Building A: 2 Storeys 28,396 SF Building B: 1 Storey 14,904 SF Building C: 1 Storey 8,463 SF |
Duration | 10 Months |
One storey commercial retail building in Fort Saskatchewan. The building is a structural steel frame on screw piles and concrete gradebeams. Exterior finishes include EIFS, Allura fibre cement siding, masonry veneer and EPDM roofing. Completion of this building will be end of June 2017.
Location | Fort Saskatchewan, AB |
Type | Competitive Tender / Lump Sum Contract |
Size | 11,072 square feet |
Duration | 8 Months |
Canbian Inc. has been involved in the project since the beginning concept stage, working with the Owner and Architect. We have brought in a design build team towards completion of the drawings The building will be a one storey structural steel frames on piles and gradebeam foundation. All bays will be commercial retail / professional occupancies. The base building electrical system will incorporate the use of solar panels on the roof. Exterior finishes include EIFS, Metal Panels, brick veneer, aluminum windows and EPDM roofing. Building construction is anticipated to be completed in early 2018.
Location | Edmonton, AB |
Type | Construction Management / Design Build |
Size | 22,464 square feet |
Duration | 10 months |
Canbian has been selected to be the General Contractor for this north Edmonton two storey office / retail development totalling 39,780sqft. The site has been cleared and we started construction on July 18, 2016. Building composition is made up of cast in place concrete foundations, structural steel skeleton, 10” insulated precast concrete walls, and an R40 PVC roof. Interior finishes included porcelain floor tile, granite wall tile, exposed concrete, paint, finish millwork, and T-bar ceilings. Anticipated completion date is January 31st, 2017.
Location | Edmonton, AB |
Type | Construction Management |
Size | 39,780 square feet |
Duration | 7 months |
There are two buildings on the site joined together on one lot with a total of 10,000 SF on two levesl plus a 5000 SF basement. The building was constructed in the early 1900s and was the original home of Canadian Furniture. Later bought by The Church of Scientology, it’s now owned by a private developer.
Scope of work: Reinforce existing floor and roof structure. Replace all roofing. Bring building up to current building code. Install new Roof Top HVAC units. Upgrade electrical service. A new facade incorporating new store front windows & entrances, cutting new upper windows on the second level, restoring the existing brick to original.
Selective Demolition to be complete to the existing facade. All Aluminum windows, sidewalks, towers and canopies to be removed. Replacement of the front sidewalk. New facade to include new storefront openings, EIFS buildouts, steel eyebrows and revisions to the existing parapet height.
Location | Stony Plain, AB |
Type | Construction Management / Design Build |
Size | 47,425 square feet |
Duration | 2 Months |
Canbian signed on to the project at the beginning concept stages and has been involved in both budgetary pricing and design of the new building. The existing 2 storey theatre is being demolished, including asbestos abatement. Once demolition is complete, a geotechnical investigation will need to be completed for final design. The new project is a storey building. Main floor will be commercial / retail bay. The second floor will be office use. Interior tenant improvement for the second floor office will also be done, including all finishes, partitions, washrooms, etc.
Location | Edmonton, AB |
Type | Construction Management / Design Build |
Size | 10,000 square feet |
Duration | 12 Months |
Preliminary design and development permit drawings were complete when Canbian became involved in this project. Located on the southeast corner of Beaumont, this is a prime retail development including three new buildings. One building has a main floor area of 30,200 sf. With a partial second floor of 20,200 square feet. The floor to floor height of 6.8 metres provides a very high ceiling for the main floor occupants. The two other buildings are single storey at 9000 sf and 6400 sf respectively. All three building are constructed to suit the French colonial theme in Beaumont using structural steel skeleton, steel stud infill, EIFS and metal cladding. Originally designed with strip footings and foundation walls, the foundation was revised to screw piles and grade beams to suit the budget and late autumn construction start.
Location | Beaumont, AB |
Type | Construction Management |
Size | 65,800 sf |
Duration | 14 months |
Canbian joined the project after preliminary design by the, owner selected, architect. Canbian arranged and coordinated the remaining consultants, structural, mechanical, electrical, civil and landscape to complete the team. This prestigious building, in the Windermere Gate Innovation Zone, is a two storey health services, professional shops structure, totaling 26,600 square feet. There are ten main floor and 6 second floor condominium units. The exterior finish will be three colour, insulated metal panels with 60% glazing and cultured stone accents. Completion is scheduled for summer 2016.
Location | Edmonton, AB |
Type | Construction Management |
Size | 26,600 SF |
Duration | 14 Months |
Located at 102 Southfork Drive, Leduc, AB., Canbian was retained to design and construct this 1 storey 13,000 SF CRU building. The main floor has 5 CRU’s and consists of a steel structure supported by concrete grade beams and piles. The exterior finishes include EIFS, Hardie Plank Siding, Storefront Glazing, Concrete Block Veneer, and a EPDM / Standing Seam Prefinished Metal Roof. Completion is estimated for the end of January 2016.
Location | Leduc, AB |
Type | Design Build / Construction Management |
Size | 13,000 SF |
Duration | 6 Months |
Canbian was retained to design and construct two new commercial condominiums buildings. Building A is 17,665 square feet and Building B is 20,600 square feet for a total of 38,265 square feet. There is a total of 24 separate units for sale. The site is on 119 street between 113 Avenue and 114 Avenue. It used to be the old Midtown Motors recycling lot. The zoning was changed from IM to IB to attract a broader clientele to the area. Completion is slated for November 2015.
Location | Edmonton, AB |
Type | Design Build / Construction Management |
Size | 38,625 sf |
Duration | 11 months |
Design Build project for 2 storey CRU/office building. The building is sprinklered. The main floor has 11 CRU’s and the second floor has 7 offices with common area washrooms. There is common entrance in the middle of the building leading to the elevator lobby. The building is steel structure infilled with steel studs and gypsum board. The exterior finishes include EIFS, concrete block veneer and aluminum metal panels and the roofing is EPDM.
Location | Edmonton, AB |
Type | Design Build / Construction Management |
Size | 16,430 SF main floor + 15,508 SF second floor = 31,938 total SF |
Duration | 9 months |
This is a 1 storey CRU at 16,235 SF. The main floor has 7 CRU’s and one 2960 SF Liquor Store. The building is sprinklered. The building is steel structure infilled with steel studs and gypsum board. The exterior finishes include EIFS, concrete block veneer and aluminum metal panels and the roofing is EPDM.
Location | Edmonton, AB |
Type | Design Build / Construction Management |
Size | 16,235 sf |
Duration | 8 months |
Phase 2 of the Savaryn Centre is a continuation of a commercial development we started in 2013. Phase 1 was completed in January 2014 and sold out within weeks of completion. Phase 2 consist of one 26,400 square foot building with 14 separate commercial condominium units for sale. The buildings are in the new South West Edmonton part of the city. Completion is slated for November 2015.
Location | Edmonton, AB |
Type | Construction Management |
Size | 26,400 sf |
Duration | 9 months |
3 Storey office building c/w elevator. The building is sprinklered. Steel structure infilled with steel studs and gypsum board. Exterior finishes are EIFS, split face concrete block veneer and longboard siding. There are 8 offices on the main floor, 6 offices on the second floor and 4 offices on the third floor. The third floor offices have access to a roof patio.
Location | Edmonton, AB |
Type | Design Build / Construction Management |
Size | 14,481 SF main floor + 11,167 SF second floor + 7,774 SF third floor = 33,422 total SF |
Duration | 14 months |
Two storey general retail / office building. Structural steel framing in-filled with steel studs and gypsum board. Exterior finish is EIFS, cultured stone, Hardie board and EPDM roofing. 8 bays on the main floor and 4 bays on the second floor. All demising walls are in. Bay walls are taped and sanded. Main floor and second floor lobby finished with tile/carpet, paint and t-bar ceilings. Two stairwells are finished with paint and VCT on the landings / rubber treads to stairs. There is 1 elevator for second floor access.
Location | Edmonton, AB |
Type | Construction Management cost plus a fixed fee |
Size | Main floor: 12,571 SF. Second Floor: 6495 SF. |
Duration | 12 months |
Location | Edmonton, AB |
Type | Design Build |
Size | 27,000 square feet |
Duration | 9 months |
New location in an existing Home Depot parking lot consisting of an office/showroom and shop. Building is of block construction with open web steel roof joists and metal deck. Included was a complete parking lot and landscaping.
Location | Edmonton, AB |
Type | Stipulated Price |
Size | 7,500 square feet |
Duration | 8 months |
Addition to the existing building to accommodate two new classrooms c/w a washroom and kitchen/office and two new therapy rooms. Existing exterior access was relocated through the new addition. Exterior finish is EIFS and SBS Roofing. New VCT flooring, painting and t-bar ceilings throughout addition.
Location | Edmonton, AB |
Type | Stipulated Price |
Size | 2,475 square feet |
Duration | 5 months |
Construction of three CRU buildings. All three consisted of grade beam on pile foundations. Structural steel with open web roof joists and metal deck made up the rest of the structure. Stucco and brick finishes to exterior.
Location | Sherwood Park, AB |
Type | Stipulated Price |
Size | CRU A – 9924 SF, CRU B – 7180 SF, CRU C – 6083 SF |
Duration | 14 months |
2 bay block addition to an existing operating location. Included the removal of an existing storage room and tank to make room for the addition. Addition consisted of grade beam on piles, block walls with metal joists and deck.
Location | Edmonton, AB |
Type | Cost Plus, Fixed Fee |
Size | 2,160 square feet |
Duration | 5 months |
New location in an existing Home Depot parking lot consisting of an office/showroom and shop. Building is of block construction with open web steel roof joists and metal deck. Included was a complete parking lot and landscaping.
Location | Edmonton, AB |
Type | Stipulated Price |
Size | 7,500 square feet |
Duration | 8 months |
Location | Edmonton, AB |
Type | Negotiated |
Size | 20,000 square feet |
Duration | 8 months |
Sleeping quarters addition to an existing fire house. Eight separate sleeping quarters complete with bed, locker and night stand. Painted walls throughout with 1.5” gypsum poured over wood joists.
Location | Spruce Grove, AB |
Type | Stipulated Price |
Size | 1,010 square feet |
Duration | 5 months |
Single storey 9100 sf. Sanctuary for 250 persons plus kitchen and classrooms. Glulam Arch sanctuary construction with conventional steel support areas.
Location | Edmonton, AB |
Type | Construction Management - Cost plus a fixed fee |
Size | 9,100 square feet |
Duration | 10 months |
Free standing single storey lube shop with full basement.
Location | Edmonton, AB |
Type | Lump Sum Tender |
Size | 3,200 square feet total |
Duration | 4 months |
Building addition and renovation. Enlarged the showroom adding new exterior walls, upgrading the entire ventilation system and completing refinishing the showroom. Added two pre-engineered metal building component to the shop area.
Location | Edmonton, AB |
Type | Construction Management - Cost plus a fixed fee |
Size | 23,000 square feet |
Duration | 10 months |
Commercial condominiums for Ironstone Properties.
Location | Edmonton, AB |
Type | Design Build |
Size | 30,000 square feet |
Duration | 8 months |
4 commercial buildings for Erickorp Properties.
Location | Edmonton, AB |
Type | Negotiated |
Size | 40,000 square feet |
Duration | 10 months |