Canbian Commercial Construction Projects

Our commercial construction projects have included office buildings, warehouses, car dealerships and commercial retail units (CRU’s). We construct to suit the requirements of our clients and the marketplace. These projects are typically non-combustible construction with a structural steel skeleton.

Commercial Light Industrial Restaurant Tenant Improvement

Commercial Projects

Fort Road Plaza

Commercial

Canbian is the construction manager for this 8000 square feet commercial retail project. The building is conventional structural steel with EIFS and metal cladding on steel stud / gypsum board walls. The lot was previously a service station which has now required a structural concrete slab on grade main floor. Construction completion is expected for June 2019.

Click to view project photos

Fort Road Plaza
Location Edmonton, AB
Type Construction Management
Size 8000 square feet
Duration 10 months

Silverberry CRU

Commercial

Canbian Inc. is the construction manager on the Silverberry project. This project is a two storey commercial building, main floor 18,000 square feet, second floor 10,600 square feet. Exterior finishes include masonry, EIFS and metal cladding, roofing is ballasted 60 mil EPDM. The structure is steel stud on structural steel, concrete grade beam on screw piles. The land usage and building location is affected by the utility easement along the east side of the property.

Click to view project photos

Silverberry CRU
Location Edmonton, AB
Type Construction Management
Size 28,600 square feet
Duration NA

Southridge Car Wash & CRU

Commercial

Canbian has been retained as the General Contractor for this single storey commercial carwash and CRU development totalling 13,300sqft in Fort Saskatchewan.  Construction started on August 1st, 2018 and is anticipated to be completed for March 30th, 2019. Building composition is made up of ICF concrete foundations which support the insulated precast concrete wall panels. The roof structure consists OWSJ’s & metal deck that support the EPDM roof.

Click to view project photos

Southridge Car Wash & CRU
Location Fort Saskatchewan, AB
Type N/A
Size 13,300 square feet
Duration 7 months

Erickorp Sherwood Park

Commercial

This project consists of the complete construction of 3 commercial buildings in Sherwood Park (58,232ft2). Foundations will consist of concrete piles & gradebeams with a concrete slab on grade. The building’s structures are comprised of a structural steel skeleton with a metal roof deck. Exterior finishes include: Aluminum windows, EIFS, masonry block, metal panels and an EPDM roof. Anticipated completion is scheduled for October 2019.

Click to view project photos

Erickorp Sherwood Park
Location Sherwood Park, AB
Type Design Build
Size 58,232 square feet
Duration 14 months

Royal Centre Beverly

Commercial

This project consists of a single storey, 7,760 SF commercial retail building in Edmonton. Foundations will be screw piles and concrete gradebeams with a structural concrete slab. The building’s structure is comprised of a structural steel skeleton with a metal roof deck. Exterior finishes include: EIFS, masonry block, and an EPDM roof. Construction started in November 2017. Anticipated completion is July, 2018. Prior to construction commencing, environmental soil remediation was completed.

Click to view project photos

Royal Centre Beverly
Location Edmonton, AB
Type Construction Management
Size 7,760 square feet
Duration 8 months

Royal Centre Chapelle

Commercial

One storey 13,250 SF commercial retail building in Edmonton. Foundations will be concrete piles and gradebeam with a slab on grade. The building will be structural steel frame with a metal roof deck. There are 3 feature wood frame peaked roofs on the front elevation. Exterior finishes include: EIFS, Hardie board, Cultured stone and masonry block. Each peaked roof will have an exposed truss held up by 2 columns clad in cultured stone. Roofing is EPDM with shingles on the sloped roof. Construction is scheduled to start in November 2017. Anticipated completion is August 2018.

Click to view project photos

Royal Centre Chapelle
Location Edmonton, AB
Type N/A
Size 13,250 square feet
Duration 11 months

Windermere Hotel and CRU

Commercial

This project consists of a new hotel and a separate CRU Commercial building on the same site. The hotel is approximately 43,200 sqft in total with 92 suites over four floors as well as an indoor pool.  The building is primarily a wood structure sitting on top of a concrete foundation.  The exterior finishes consists largely of EFIS stucco along with a TPO membrane roof. The commercial building has a 10,000 sqft foot print comprised of a conventional steel frame structure and grade beam foundation.  This building features aluminum windows, EFIS stucco and masonry exterior finishes.

Click to view project photos

Windermere Hotel and CRU
Location Edmonton, AB
Type Construction Managers
Size Hotel 43,200 sqft
CRU 10,000 sqft
Duration 18 months

Mill Creek Carwash

Commercial

Canbian has been selected to be the General Contractor for this south Edmonton single storey commercial carwash development totalling 14,035sqft.  Construction started on August 21st and is anticipated to be completed for February 28th, 2018. Building composition is made up of cast in place concrete strip footings and foundation walls which support the Conform Stay-in-Place concrete wall forming system (by NuForm). The roof structure consists of precast concrete Hollow-core and Double-tee members with a EPDM roof membrane. Interior finishes included Reline panels (by NuForm), painted drywall, t-bar ceilings, exposed Hollow-core and Double-tee’s, and a concrete slab on grade.

Click to view project photos

Mill Creek Carwash
Location Edmonton, AB
Type Competitive Tender / Lump Sum Contract
Size 14,035 square feet
Duration 6 months

McConachie West

Commercial

Two storey commercial building with retail on the main floor (18,830 SF) and a Dentist and Daycare on the second (9,809 SF). Structural steel frame building on concrete piles and gradebeam. Main floor will be a concrete slab on grade. Second floor will be concrete topping on metal deck. Exterior finishes include EIFS, masonry veneer, Hardie Board siding and AL-13 panels. Roofing will be EPDM. Phase 1 sitework to include two new commercial crossings, paving, curbs and sidewalks for Building A. Base Building to be completed in December 2017.

Click to view project photos

McConachie West
Location Edmonton, AB
Type Competitive Tender / Lump Sum Contract
Size Building A: 2 Storeys 28,396 SF
Building B: 1 Storey 14,904 SF
Building C: 1 Storey 8,463 SF
Duration 10 Months
Download Project PDF

Southridge Landing – Building A

Commercial

One storey commercial retail building in Fort Saskatchewan. The building is a structural steel frame on screw piles and concrete gradebeams. Exterior finishes include EIFS, Allura fibre cement siding, masonry veneer and EPDM roofing. Completion of this building will be end of June 2017.

Click to view project photos

Southridge Landing – Building A
Location Fort Saskatchewan, AB
Type Competitive Tender / Lump Sum Contract
Size 11,072 square feet
Duration 8 Months
Download Project PDF

Royal Centre Hills

Commercial

Canbian Inc. has been involved in the project since the beginning concept stage, working with the Owner and Architect. We have brought in a design build team towards completion of the drawings The building will be a one storey structural steel frames on piles and gradebeam foundation. All bays will be commercial retail / professional occupancies. The base building electrical system will incorporate the use of solar panels on the roof. Exterior finishes include EIFS, Metal Panels, brick veneer, aluminum windows and EPDM roofing. Building construction is anticipated to be completed in early 2018.

Click to view project photos

Royal Centre Hills
Location Edmonton, AB
Type Construction Management / Design Build
Size 22,464 square feet
Duration 10 months
Download Project PDF

Klarvatten Commercial

Commercial

Canbian has been selected to be the General Contractor for this north Edmonton two storey office / retail development totalling 39,780sqft.  The site has been cleared and we started construction on July 18, 2016. Building composition is made up of cast in place concrete foundations, structural steel skeleton, 10” insulated precast concrete walls, and an R40 PVC roof. Interior finishes included porcelain floor tile, granite wall tile, exposed concrete, paint, finish millwork, and T-bar ceilings. Anticipated completion date is January 31st, 2017.

Click to view project photos

Klarvatten Commercial
Location Edmonton, AB
Type Construction Management
Size 39,780 square feet
Duration 7 months
Download Project PDF

The Quarters

Commercial

There are two buildings on the site joined together on one lot with a total of 10,000 SF on two levesl plus a 5000 SF basement. The building was constructed in the early 1900s and was the original home of Canadian Furniture. Later bought by The Church of Scientology, it’s now owned by a private developer.

Scope of work: Reinforce existing floor and roof structure. Replace all roofing. Bring building up to current building code. Install new Roof Top HVAC units. Upgrade electrical service. A new facade incorporating new store front windows & entrances, cutting new upper windows on the second level, restoring the existing brick to original.

Click to view project photos

The Quarters
Location Edmonton
Type N/A
Size 15,000 square feet
Duration 8 Months
Download Project PDF

Meridian Mall Facade Replacement

Commercial

Selective Demolition to be complete to the existing facade. All Aluminum windows, sidewalks, towers and canopies to be removed. Replacement of the front sidewalk. New facade to include new storefront openings, EIFS buildouts, steel eyebrows and revisions to the existing parapet height.

Click to view project photos

Meridian Mall Facade Replacement
Location Stony Plain, AB
Type Construction Management / Design Build
Size 47,425 square feet
Duration 2 Months
Download Project PDF

JP Centre

Commercial

Canbian signed on to the project at the beginning concept stages and has been involved in both budgetary pricing and design of the new building. The existing 2 storey theatre is being demolished, including asbestos abatement. Once demolition is complete, a geotechnical investigation will need to be completed for final design. The new project is a storey building. Main floor will be commercial / retail bay. The second floor will be office use. Interior tenant improvement for the second floor office will also be done, including all finishes, partitions, washrooms, etc.

Click to view project photos

JP Centre
Location Edmonton, AB
Type Construction Management / Design Build
Size 10,000 square feet
Duration 12 Months
Download Project PDF

Bryant Heritage Plaza

Commercial

Preliminary design and development permit drawings were complete when Canbian became involved in this project. Located on the southeast corner of Beaumont, this is a prime retail development including three new buildings. One building has a main floor area of 30,200 sf. With a partial second floor of 20,200 square feet. The floor to floor height of 6.8 metres provides a very high ceiling for the main floor occupants. The two other buildings are single storey at 9000 sf and 6400 sf respectively. All three building are constructed to suit the French colonial theme in Beaumont using structural steel skeleton, steel stud infill, EIFS and metal cladding. Originally designed with strip footings and foundation walls, the foundation was revised to screw piles and grade beams to suit the budget and late autumn construction start.

Click to view project photos

Bryant Heritage Plaza
Location Beaumont, AB
Type Construction Management
Size 65,800 sf
Duration 14 months
Download Project PDF

Windermere Gate Plaza

Commercial

Canbian joined the project after preliminary design by the, owner selected, architect. Canbian arranged and coordinated the remaining consultants, structural, mechanical, electrical, civil and landscape to complete the team. This prestigious building, in the Windermere Gate Innovation Zone, is a two storey health services, professional shops structure, totaling 26,600 square feet. There are ten main floor and 6 second floor condominium units. The exterior finish will be three colour, insulated metal panels with 60% glazing and cultured stone accents. Completion is scheduled for summer 2016.

Click to view project photos

Windermere Gate Plaza
Location Edmonton, AB
Type Construction Management
Size 26,600 SF
Duration 14 Months
Download Project PDF

Southfork Centre

Commercial

Located at 102 Southfork Drive, Leduc, AB., Canbian was retained to design and construct this 1 storey 13,000 SF CRU building. The main floor has 5 CRU’s and consists of a steel structure supported by concrete grade beams and piles. The exterior finishes include EIFS, Hardie Plank Siding, Storefront Glazing, Concrete Block Veneer, and a EPDM / Standing Seam Prefinished Metal Roof. Completion is estimated for the end of January 2016.

Click to view project photos

Southfork Centre
Location Leduc, AB
Type Design Build / Construction Management
Size 13,000 SF
Duration 6 Months
Download Project PDF

Midtown Centre

Commercial

Canbian was retained to design and construct two new commercial condominiums buildings.  Building A is 17,665 square feet and Building B is 20,600 square feet for a total of 38,265 square feet.  There is a total of 24 separate units for sale.  The site is on 119 street between 113 Avenue and 114 Avenue.  It used to be the old Midtown Motors recycling lot.  The zoning was changed from IM to IB to attract a broader clientele to the area.  Completion is slated for November 2015.

Click to view project photos

Midtown Centre
Location Edmonton, AB
Type Design Build / Construction Management
Size 38,625 sf
Duration 11 months
Download Project PDF

Sector 17

Commercial

Design Build project for 2 storey CRU/office building. The building is sprinklered. The main floor has 11 CRU’s and the second floor has 7 offices with common area washrooms. There is common entrance in the middle of the building leading to the elevator lobby. The building is steel structure infilled with steel studs and gypsum board. The exterior finishes include EIFS, concrete block veneer and aluminum metal panels and the roofing is EPDM.

Click to view project photos

Sector 17
Location Edmonton, AB
Type Design Build / Construction Management
Size 16,430 SF main floor + 15,508 SF second floor = 31,938 total SF
Duration 9 months
Download Project PDF

McConachie

Commercial

This is a 1 storey CRU at 16,235 SF. The main floor has 7 CRU’s and one 2960 SF Liquor Store. The building is sprinklered. The building is steel structure infilled with steel studs and gypsum board. The exterior finishes include EIFS, concrete block veneer and aluminum metal panels and the roofing is EPDM.

Click to view project photos

McConachie
Location Edmonton, AB
Type Design Build / Construction Management
Size 16,235 sf
Duration 8 months
Download Project PDF

Savaryn 2

Commercial

Phase 2 of the Savaryn Centre is a continuation of a commercial development we started in 2013.  Phase 1 was completed in January 2014 and sold out within weeks of completion.  Phase 2 consist of one 26,400 square foot building with 14 separate commercial condominium units for sale.  The buildings are in the new South West Edmonton part of the city.  Completion is slated for November 2015.

Click to view project photos

Savaryn 2
Location Edmonton, AB
Type Construction Management
Size 26,400 sf
Duration 9 months
Download Project PDF

Royal Centre South

Commercial

3 Storey office building c/w elevator. The building is sprinklered. Steel structure infilled with steel studs and gypsum board. Exterior finishes are EIFS, split face concrete block veneer and longboard siding. There are 8 offices on the main floor, 6 offices on the second floor and 4 offices on the third floor. The third floor offices have access to a roof patio.

Click to view project photos

Royal Centre South
Location Edmonton, AB
Type Design Build / Construction Management
Size 14,481 SF main floor + 11,167 SF second floor + 7,774 SF third floor = 33,422 total SF
Duration 14 months
Download Project PDF

Royal Center North

Commercial

Two storey general retail / office building. Structural steel framing in-filled with steel studs and gypsum board. Exterior finish is EIFS, cultured stone, Hardie board and EPDM roofing. 8 bays on the main floor and 4 bays on the second floor. All demising walls are in. Bay walls are taped and sanded. Main floor and second floor lobby finished with tile/carpet, paint and t-bar ceilings. Two stairwells are finished with paint and VCT on the landings / rubber treads to stairs. There is 1 elevator for second floor access.

Click to view project photos

Royal Center North
Location Edmonton, AB
Type Construction Management cost plus a fixed fee
Size Main floor: 12,571 SF. Second Floor: 6495 SF.
Duration 12 months
Download Project PDF

Savaryn Centre

Commercial

Commercial Condominiums.

Click to view project photos

Savaryn Centre
Location Edmonton, AB
Type Design Build
Size 27,000 square feet
Duration 9 months
Download Project PDF

Kal Tire Clareview

Commercial

New location in an existing Home Depot parking lot consisting of an office/showroom and shop.  Building is of block construction with open web steel roof joists and metal deck.  Included was a complete parking lot and landscaping.

Click to view project photos

Kal Tire Clareview
Location Edmonton, AB
Type Stipulated Price
Size 7,500 square feet
Duration 8 months
Download Project PDF

Elves Special Needs Addition

Commercial

Addition to the existing building to accommodate two new classrooms c/w a washroom and kitchen/office and two new therapy rooms. Existing exterior access was relocated through the new addition. Exterior finish is EIFS and SBS Roofing. New VCT flooring, painting and t-bar ceilings throughout addition.

Click to view project photos

Elves Special Needs Addition
Location Edmonton, AB
Type Stipulated Price
Size 2,475 square feet
Duration 5 months
Download Project PDF

Emerald Hills

Commercial

Construction of three CRU buildings.  All three consisted of grade beam on pile foundations.  Structural steel with open web roof joists and metal deck made up the rest of the structure.  Stucco and brick finishes to exterior.

Click to view project photos

Emerald Hills
Location Sherwood Park, AB
Type Stipulated Price
Size CRU A – 9924 SF, CRU B – 7180 SF, CRU C – 6083 SF
Duration 14 months
Download Project PDF

Kal Tire Gateway Addition

Commercial

2 bay block addition to an existing operating location.  Included the removal of an existing storage room and tank to make room for the addition.  Addition consisted of grade beam on piles, block walls with metal joists and deck.

Click to view project photos

Kal Tire Gateway Addition
Location Edmonton, AB
Type Cost Plus, Fixed Fee
Size 2,160 square feet
Duration 5 months
Download Project PDF

Kal Tire – South Edmonton Common

Commercial

New location in an existing Home Depot parking lot consisting of an office/showroom and shop.  Building is of block construction with open web steel roof joists and metal deck.  Included was a complete parking lot and landscaping.

Click to view project photos

Kal Tire – South Edmonton Common
Location Edmonton, AB
Type Stipulated Price
Size 7,500 square feet
Duration 8 months
Download Project PDF

North City Centre

Commercial

Two story office building.

Click to view project photos

North City Centre
Location Edmonton, AB
Type Negotiated
Size 20,000 square feet
Duration 8 months
Download Project PDF

Spruce Grove Fire Hall Addition

Commercial

Sleeping quarters addition to an existing fire house. Eight separate sleeping quarters complete with bed, locker and night stand. Painted walls throughout with 1.5” gypsum poured over wood joists.

Click to view project photos

Spruce Grove Fire Hall Addition
Location Spruce Grove, AB
Type Stipulated Price
Size 1,010 square feet
Duration 5 months
Download Project PDF

Korean Presbyterian Church

Commercial

Single storey 9100 sf. Sanctuary for 250 persons plus kitchen and classrooms. Glulam Arch sanctuary construction with conventional steel support areas.

Click to view project photos

Korean Presbyterian Church
Location Edmonton, AB
Type Construction Management - Cost plus a fixed fee
Size 9,100 square feet
Duration 10 months
Download Project PDF

Lubexx Northtown Mall

Commercial

Free standing single storey lube shop with full basement.

Click to view project photos

Lubexx Northtown Mall
Location Edmonton, AB
Type Lump Sum Tender
Size 3,200 square feet total
Duration 4 months
Download Project PDF

Sundance Mazda

Commercial

Building addition and renovation. Enlarged the showroom adding new exterior walls, upgrading the entire ventilation system and completing refinishing the showroom. Added two pre-engineered metal building component to the shop area.

Click to view project photos

Sundance Mazda
Location Edmonton, AB
Type Construction Management - Cost plus a fixed fee
Size 23,000 square feet
Duration 10 months
Download Project PDF

Ironstone Buildings

Commercial

Commercial condominiums for Ironstone Properties.

Click to view project photos

Ironstone Buildings
Location Edmonton, AB
Type Design Build
Size 30,000 square feet
Duration 8 months
Download Project PDF

Subaru City

Commercial

New car dealership for Subaru City.

Click to view project photos

Subaru City
Location Edmonton, AB
Type Tender
Size 32,000 square feet
Duration 10 months
Download Project PDF

Erickorp Commercial Buildings

Commercial

4 commercial buildings for Erickorp Properties.

Click to view project photos

Erickorp Commercial Buildings
Location Edmonton, AB
Type Negotiated
Size 40,000 square feet
Duration 10 months
Download Project PDF