A restaurant is defined as a commercial establishment where meals can be bought and eaten. As our portfolio can attest we have completed many different projects of varying size and complexity that fall under this category. From stand-alone structures to food court fit up’s we have completed them all. Our repeat clients in this segment are standing testimony to our expertise.
Interior renovations to dining room, kitchen and public bathrooms. Dining room and public washrooms to receive all new finishes and furniture. Modifications to the kitchen include a new partition wall, new FRP, plumbing and HVAC revisions, relocations of kitchen equipment. Exterior building revisions are to be completed as well, including new buildout around the front door and drive thru window. Buildouts to be cladded with red metal panels. Hardie board around the front end of the store, and painting to the remainder of the building. New handi cap ramp and curb at the drive thru entrance to be completed.
Location | Edmonton, AB |
Type | Lump Sum Contract |
Size | 2,240 square feet |
Duration | 1 Month |
Interior tenant improvement for a Carl’s Jr. Restaurant. The project is for complete dining room finishes and kitchen installation for the restaurant.
Location | Edmonton, AB |
Type | Lump Sum Contract |
Size | 2,908 square feet |
Duration | 3 Months |
New wood framed Tim Hortons / Cold Stone Creamery restaurant with drive thru. Exterior finish is EIFS, cultured stone and TPO roofing. Ceramic tile throughout. Painting and t-bar ceiling to public areas. FRP to kitchen walls.
Location | Edmonton, AB |
Type | Stipulated Price |
Size | 2,701 square feet |
Duration | 5 months |
Extensive renovation including new dining room and bathrooms as well as a complete removal and application of new finishes to exterior. Project included structural changes along with the aesthetic changes.
Complete gut and new build out of the dining room and washrooms in an existing operating McDonalds. This project also included work to the drive thru and kitchen to a lesser extent. All new furniture and finished were installed.
Location | Edmonton, AB |
Type | Stipulated Price |
Size | 5,300 square feet |
Duration | 6 weeks |
Location | Beaumont, AB |
Type | Negotiated lump sum |
Size | 2,800 square feet |
Duration | 3 months |
Free standing single story wood frame building for the new Tim Horton’s in Westmount Centre in Edmonton.
Location | Westmount Centre, Edmonton, AB |
Type | Stipulated Sum Tender |
Size | 3,000 square feet |
Duration | 3 months |