Our commitment to our projects & customers

At Canbian we have developed a faithful following of returning clients due to the honesty, integrity, and respect that we bring to every project. We have extensive expertise in Construction Management, Design-Build, and Lump-Sum Tender projects.

We have considerable diversity in areas including Commercial Construction, Light Industrial Buildings, Food Industry Projects, Restaurants, Building Additions, and Tenant Improvements.

Current Commercial Light Industrial Restaurant Tenant Improvement

Ewing Trail Plaza

Commercial

Construction of 3 CRU buildings and 1 wand car wash on a 3 Acre site in SW Edmonton. Foundations on all buildings are screw piles and gradebeam c/w a slab on grade. The 3 CRU’s are conventional structural steel framed with steel stud walls and gypsum board. There will be an EIFS finish to the buildings, with some feature metal panels and store front windows. The car wash will have painted precast walls and galvanized OWSJ. All 4 buildings will have an EPDM roof. Anticipated Completion is June 2021.

Click to view project photos

Ewing Trail Plaza
Location Edmonton, AB
Type CCDC-2 / Lump Sum Tender
Size 36,146 square feet
Duration 12 Months

Royal Centre Keswick

Commercial

Canbian Inc. will be completing 3 new buildings on the Royal Centre Keswick site. Building A will be a 16,387 SF, CRU general retail building. Building B will be the shell building for a 4,960 SF daycare.
Building C will be the shell building for a 4,100 SF gas station convenience store. All associated site servicing, concrete, paving and landscaping will be completed for the entire site. The exterior finishes of the building will be a combination of the stucco, masonry and metal panels. Roofing will be EPDM. The anticipate completion of this project January 2021.

Click to view project photos

Royal Centre Keswick
Location Edmonton, AB
Type Design Build / Construction Management
Size 25,500 square feet
Duration 10 months

End Of The Roll Parsons Road

Light Industrial

The new End of the Roll building is a one storey Industrial building located on Parsons Road in Edmonton. The building will include a sales area, as well as storage and racking for the flooring products sold. There will be a mezzanine area for the offices. The back of the building will be warehouse space with 1 loading dock door, and 1 ground level receiving door. The building will be structural steel framed with an EPDM roof. Exterior finishes include large store front windows, masonry and metal siding. The anticipated completion of this project is July 2020.This project will be the 4th building completed for End of the Roll.

Click to view project photos

End Of The Roll Parsons Road
Location Edmonton, AB
Type CCDC-2 / Lump Sum Tender
Size 18,428 square feet
Duration 8 months

MacLab Liquor House

Tenant Improvement

Canbian was contracted to complete the interior tenant improvements for a new “Liquor House” store. This 2,968ft2 liquor store is located on the north side of Edmonton and will be the 4th liquor store that we have completed for “Liquor House”. The interior finishes to be completed include drywall, flooring, painting, millwork, coolers, security roll shutters, mechanical, and electrical scopes of work.

Click to view project photos

MacLab Liquor House
Location Edmonton, AB
Type Lump Sum Contract
Size 2,968 square feet
Duration 2 months

Alliance Commercial Southport

Commercial

This project consists of the complete construction of 3 commercial buildings in the Ellerslie Industrial area of Edmonton (19,442ft2 total). Building A is a 15,441ft2 commercial retail unit building, building B is a 3,007ft2 C-Store for 7-Eleven, and building C is a 994ft2 automatic car wash for 7-Eleven. Construction of this project started in October of 2019 and turn over is anticipated for fall of 2020.

Click to view project photos

Alliance Commercial Southport
Location Edmonton, AB
Type Design Build
Size 19,442 square feet
Duration 12 months

Alliance Commercial 156th Street

Commercial

This project consists of a single storey, 11,532ft2 commercial retail building in Edmonton. Foundations are to consist of helical screw piles and concrete grade beams with a concrete slab on grade. The building’s structure is comprised of a structural steel skeleton with a metal roof deck. Exterior finishes include: EIFS, masonry block, and an EPDM roof. Construction slated to start in March, 2020 and have a completion of October, 2020.

Click to view project photos

Alliance Commercial 156th Street
Location Edmonton, AB
Type Design Build
Size 11,532 square feet
Duration 8 months

Glenridding Commercial

Commercial

Canbian Inc. was the successful contractor to be awarded the Glenridding Commercial project. This project is a two storey commercial building, main floor is 21,317 square feet, second floor is 14,614 square feet. The building’s structure is comprised of a structural steel skeleton with metal roof deck and steel stud walls. Exterior finishes include masonry, EIFS, and metal cladding. Roofing is a mix of SBS roofing for the second floor patio areas and EPDM roofing for the remainder. Anticipated completion is scheduled for October 2020.

Click to view project photos

Glenridding Commercial
Location Edmonton, AB
Type CCDC#2 / Tender
Size 35,931 square feet
Duration 12 Months

Elves Special Needs Society Building Addition

Commercial

Canbian has been retained as the General Contractor for the Elves Society Building Addition and Renovations.  Construction started in August 2018 with the demolition of a portion of the existing building to make way for the new addition.  The existing building foundations needed to be underpinned and supported before construction of the new basement could commence.  The new addition is made of reinforced concrete footings and concrete walls, structure steel columns, beams, OWSJ and metal floor and roof deck.  Completion is slated for end of August 2019.

Click to view project photos

Elves Special Needs Society Building Addition
Location Edmonton, AB
Type Institutional / Tender
Size 11,000 square feet
Duration 12 months

Fort Road Plaza

Commercial

Canbian is the construction manager for this 8000 square feet commercial retail project. The building is conventional structural steel with EIFS and metal cladding on steel stud / gypsum board walls. The lot was previously a service station which has now required a structural concrete slab on grade main floor. Construction completion is expected for June 2019.

Click to view project photos

Fort Road Plaza
Location Edmonton, AB
Type Construction Management
Size 8000 square feet
Duration 10 months
Top