Our commitment to our projects & customers

At Canbian we have developed a faithful following of returning clients due to the honesty, integrity, and respect that we bring to every project. We have extensive expertise in Construction Management, Design-Build, and Lump-Sum Tender projects.

We have considerable diversity in areas including Commercial Construction, Light Industrial Buildings, Food Industry Projects, Restaurants, Building Additions, and Tenant Improvements.

Current Commercial Light Industrial Restaurant Tenant Improvement

Cannabis House

Tenant Improvement

Cannabis House is an upcoming chain of Recreational Cannabis Dispensaries. We were asked by our clients if we could build 4 locations for their future businesses. The interior renovation includes adding a secure cannabis room which is a strictly controlled partition construction which includes Steel studs, steel mesh, 16ga sheet steel ,5/8th inch drywall, anti spread bracing, 14ga door frames all to AGLC standards. The sales area includes a hanging trellis which houses lighting, and security systems. Expected completion ranging from recreational cannabis legalization day October 17, 2018 to late October 2018.

Click to view project photos

Cannabis House
Location Edmonton, AB - 4 Locations
Type Interior Tennant improvement
Size 1,200 - 1,600 square feet
Duration 4 Months

SCS Building

Light Industrial

The SCS Warehouse Office Building is a purpose-built building for Solution Controls Systems Inc. They do industrial electrical control panels and automation. The foundation will consist of a Grade beam system resting on Screw piles. The structure of the building will be steel columns joists and beams including a steel corrugated roof deck. Exterior finishes will include EFIS stucco, Masonry block and aluminum window curtain wall. The Warehouse area will be comprised of insulated metal panels. The roof is an EPDM roof. Anticipated completion will be first week of March 2019.

Click to view project photos

SCS Building
Location Edmonton, AB
Type Design Build
Size 15,000 square feet
Duration 7 Months

Fort Road Plaza

Commercial

Canbian is the construction manager for this 8000 square feet commercial retail project. The building is conventional structural steel with EIFS and metal cladding on steel stud / gypsum board walls. The lot was previously a service station which has now required a structural concrete slab on grade main floor. Construction completion is expected for June 2019.

Click to view project photos

Fort Road Plaza
Location Edmonton, AB
Type Construction Management
Size 8000 square feet
Duration 10 months

Silverberry CRU

Commercial

Canbian Inc. is the construction manager on the Silverberry project. This project is a two storey commercial building, main floor 18,000 square feet, second floor 10,600 square feet. Exterior finishes include masonry, EIFS and metal cladding, roofing is ballasted 60 mil EPDM. The structure is steel stud on structural steel, concrete grade beam on screw piles. The land usage and building location is affected by the utility easement along the east side of the property.

Click to view project photos

Silverberry CRU
Location Edmonton, AB
Type Construction Management
Size 28,600 square feet
Duration NA

Southridge Car Wash & CRU

Commercial

Canbian has been retained as the General Contractor for this single storey commercial carwash and CRU development totalling 13,300sqft in Fort Saskatchewan.  Construction started on August 1st, 2018 and is anticipated to be completed for March 30th, 2019. Building composition is made up of ICF concrete foundations which support the insulated precast concrete wall panels. The roof structure consists OWSJ’s & metal deck that support the EPDM roof.

Click to view project photos

Southridge Car Wash & CRU
Location Fort Saskatchewan, AB
Type N/A
Size 13,300 square feet
Duration 7 months

Erickorp Sherwood Park

Commercial

This project consists of the complete construction of 3 commercial buildings in Sherwood Park (58,232ft2). Foundations will consist of concrete piles & gradebeams with a concrete slab on grade. The building’s structures are comprised of a structural steel skeleton with a metal roof deck. Exterior finishes include: Aluminum windows, EIFS, masonry block, metal panels and an EPDM roof. Anticipated completion is scheduled for October 2019.

Click to view project photos

Erickorp Sherwood Park
Location Sherwood Park, AB
Type Design Build
Size 58,232 square feet
Duration 14 months

Royal Centre Beverly

Commercial

This project consists of a single storey, 7,760 SF commercial retail building in Edmonton. Foundations will be screw piles and concrete gradebeams with a structural concrete slab. The building’s structure is comprised of a structural steel skeleton with a metal roof deck. Exterior finishes include: EIFS, masonry block, and an EPDM roof. Construction started in November 2017. Anticipated completion is July, 2018. Prior to construction commencing, environmental soil remediation was completed.

Click to view project photos

Royal Centre Beverly
Location Edmonton, AB
Type Construction Management
Size 7,760 square feet
Duration 8 months

Royal Centre Chapelle

Commercial

One storey 13,250 SF commercial retail building in Edmonton. Foundations will be concrete piles and gradebeam with a slab on grade. The building will be structural steel frame with a metal roof deck. There are 3 feature wood frame peaked roofs on the front elevation. Exterior finishes include: EIFS, Hardie board, Cultured stone and masonry block. Each peaked roof will have an exposed truss held up by 2 columns clad in cultured stone. Roofing is EPDM with shingles on the sloped roof. Construction is scheduled to start in November 2017. Anticipated completion is August 2018.

Click to view project photos

Royal Centre Chapelle
Location Edmonton, AB
Type N/A
Size 13,250 square feet
Duration 11 months

Windermere Hotel and CRU

Commercial

This project consists of a new hotel and a separate CRU Commercial building on the same site. The hotel is approximately 43,200 sqft in total with 92 suites over four floors as well as an indoor pool.  The building is primarily a wood structure sitting on top of a concrete foundation.  The exterior finishes consists largely of EFIS stucco along with a TPO membrane roof. The commercial building has a 10,000 sqft foot print comprised of a conventional steel frame structure and grade beam foundation.  This building features aluminum windows, EFIS stucco and masonry exterior finishes.

Click to view project photos

Windermere Hotel and CRU
Location Edmonton, AB
Type Construction Managers
Size Hotel 43,200 sqft
CRU 10,000 sqft
Duration 18 months

Mill Creek Carwash

Commercial

Canbian has been selected to be the General Contractor for this south Edmonton single storey commercial carwash development totalling 14,035sqft.  Construction started on August 21st and is anticipated to be completed for February 28th, 2018. Building composition is made up of cast in place concrete strip footings and foundation walls which support the Conform Stay-in-Place concrete wall forming system (by NuForm). The roof structure consists of precast concrete Hollow-core and Double-tee members with a EPDM roof membrane. Interior finishes included Reline panels (by NuForm), painted drywall, t-bar ceilings, exposed Hollow-core and Double-tee’s, and a concrete slab on grade.

Click to view project photos

Mill Creek Carwash
Location Edmonton, AB
Type Competitive Tender / Lump Sum Contract
Size 14,035 square feet
Duration 6 months

McConachie West

Commercial

Two storey commercial building with retail on the main floor (18,830 SF) and a Dentist and Daycare on the second (9,809 SF). Structural steel frame building on concrete piles and gradebeam. Main floor will be a concrete slab on grade. Second floor will be concrete topping on metal deck. Exterior finishes include EIFS, masonry veneer, Hardie Board siding and AL-13 panels. Roofing will be EPDM. Phase 1 sitework to include two new commercial crossings, paving, curbs and sidewalks for Building A. Base Building to be completed in December 2017.

Click to view project photos

McConachie West
Location Edmonton, AB
Type Competitive Tender / Lump Sum Contract
Size Building A: 2 Storeys 28,396 SF
Building B: 1 Storey 14,904 SF
Building C: 1 Storey 8,463 SF
Duration 10 Months
Download Project PDF

Royal Centre Hills

Commercial

Canbian Inc. has been involved in the project since the beginning concept stage, working with the Owner and Architect. We have brought in a design build team towards completion of the drawings The building will be a one storey structural steel frames on piles and gradebeam foundation. All bays will be commercial retail / professional occupancies. The base building electrical system will incorporate the use of solar panels on the roof. Exterior finishes include EIFS, Metal Panels, brick veneer, aluminum windows and EPDM roofing. Building construction is anticipated to be completed in early 2018.

Click to view project photos

Royal Centre Hills
Location Edmonton, AB
Type Construction Management / Design Build
Size 22,464 square feet
Duration 10 months
Download Project PDF