Current Commercial Light Industrial Restaurant Tenant Improvement
Canbian was contracted to complete the interior tenant improvements for three “Liquor House” stores varying from 2,765 ft2 to 4,122 ft2 in size. One of the stores is located in Fort Saskatchewan and the other two on the north side of Edmonton. Interior finishes completed include drywall, flooring, painting, millwork, coolers, security roll shutters, mechanical, and electrical scopes of work.
Location | Edmonton & Fort Saskatchewan |
Type | Lump Sum Contract |
Size | 2,765 to 4,122 square feet |
Duration | 2 months each |
The Jasper Place Square building is designed as a 2-story CRU building with a daycare on the second floor with a rooftop outdoor play area. The foundation is a grade bream system resting on end bearing piles. The Structure of the building consist of steel columns, beams, and joists. The 2nd floor is a 5” concrete slab over metal floor deck. The roof is an EPDM system. Exterior finishes include EIFS, cultured Stone, aluminum doors and glazing system and a wooden trellis. Anticipated completion is first week of July 2019.
Location | Edmonton, AB |
Type | Lump Sum Tender |
Size | 14,240 square feet |
Duration | 6 months |
Cannabis House is an upcoming chain of Recreational Cannabis Dispensaries. We were asked by our clients if we could build 4 locations for their future businesses. The interior renovation includes adding a secure cannabis room which is a strictly controlled partition construction which includes Steel studs, steel mesh, 16ga sheet steel ,5/8th inch drywall, anti spread bracing, 14ga door frames all to AGLC standards. The sales area includes a hanging trellis which houses lighting, and security systems. Expected completion ranging from recreational cannabis legalization day October 17, 2018 to late October 2018.
Location | Edmonton, AB - 4 Locations |
Type | Interior Tennant improvement |
Size | 1,200 - 1,600 square feet |
Duration | 4 Months |
The SCS Warehouse Office Building is a purpose-built building for Solution Controls Systems Inc. They do industrial electrical control panels and automation. The foundation will consist of a Grade beam system resting on Screw piles. The structure of the building will be steel columns joists and beams including a steel corrugated roof deck. Exterior finishes will include EFIS stucco, Masonry block and aluminum window curtain wall. The Warehouse area will be comprised of insulated metal panels. The roof is an EPDM roof. Anticipated completion will be first week of March 2019.
Location | Edmonton, AB |
Type | Design Build |
Size | 15,000 square feet |
Duration | 7 Months |
Canbian is the construction manager for this 8000 square feet commercial retail project. The building is conventional structural steel with EIFS and metal cladding on steel stud / gypsum board walls. The lot was previously a service station which has now required a structural concrete slab on grade main floor. Construction completion is expected for June 2019.
Location | Edmonton, AB |
Type | Construction Management |
Size | 8000 square feet |
Duration | 10 months |
Canbian Inc. is the construction manager on the Silverberry project. This project is a two storey commercial building, main floor 18,000 square feet, second floor 10,600 square feet. Exterior finishes include masonry, EIFS and metal cladding, roofing is ballasted 60 mil EPDM. The structure is steel stud on structural steel, concrete grade beam on screw piles. The land usage and building location is affected by the utility easement along the east side of the property.
Location | Edmonton, AB |
Type | Construction Management |
Size | 28,600 square feet |
Duration | NA |
Canbian has been retained as the General Contractor for this single storey commercial carwash and CRU development totalling 13,300sqft in Fort Saskatchewan. Construction started on August 1st, 2018 and is anticipated to be completed for March 30th, 2019. Building composition is made up of ICF concrete foundations which support the insulated precast concrete wall panels. The roof structure consists OWSJ’s & metal deck that support the EPDM roof.
Location | Fort Saskatchewan, AB |
Type | N/A |
Size | 13,300 square feet |
Duration | 7 months |
This project consists of the complete construction of 3 commercial buildings in Sherwood Park (58,232ft2). Foundations will consist of concrete piles & gradebeams with a concrete slab on grade. The building’s structures are comprised of a structural steel skeleton with a metal roof deck. Exterior finishes include: Aluminum windows, EIFS, masonry block, metal panels and an EPDM roof. Anticipated completion is scheduled for October 2019.
Location | Sherwood Park, AB |
Type | Design Build |
Size | 58,232 square feet |
Duration | 14 months |
This project consists of a new hotel and a separate CRU Commercial building on the same site. The hotel is approximately 43,200 sqft in total with 92 suites over four floors as well as an indoor pool. The building is primarily a wood structure sitting on top of a concrete foundation. The exterior finishes consists largely of EFIS stucco along with a TPO membrane roof. The commercial building has a 10,000 sqft foot print comprised of a conventional steel frame structure and grade beam foundation. This building features aluminum windows, EFIS stucco and masonry exterior finishes.
Location | Edmonton, AB |
Type | Construction Managers |
Size | Hotel 43,200 sqft CRU 10,000 sqft |
Duration | 18 months |