Plan Room

Interested in working with us on a project? We currently have 5 projects for which we are accepting new bids. Click on any of the projects below for more information and to download the asset package.

New Projects

Canbian Plan Room

SCS Building

Project Description

​One Storey Warehouse / office with associated site work located in Edmonton. Mechanical and Electrical are design build and have been awarded. All other scopes are open to tender.

Please direct tender inquiries and send all quotations to Dustin Tonsi by emailing at dustin@canbian.com.

Tender Closing: June 28th, 2018 @ 2:00PM.

Submitting Your Bid

If you'd like to submit a bid for this project, please send your proposal to dustin@canbian.com.

Closing Date

June 28, 2018

Download Asset Package

Southridge Car Wash & CRU

Project Description

One Storey CRU building with associated site work. Mechanical and Electrical are design build and have been awarded. All other scopes are open to tender.

Please direct tender inquiries and send all quotations to Dustin Tonsi by emailing at dustin@canbian.com.

Tender Closing: July 4th, 2018 @ 2:00PM.

Submitting Your Bid

If you'd like to submit a bid for this project, please send your proposal to dustin@canbian.com.

Closing Date

July 4, 2018

Download Asset Package

Erickorp Sherwood Park

Project Description

Canbian has been contracted to work as the general contractor for the complete construction of 3 commercial buildings in Sherwood Park (58,232 ft2). The project is in the final stages of Development permit and construction is scheduled to start summer 2018.

Please direct tender inquiries and send all quotations to Dustin Tonsi by emailing at dustin@canbian.com.

Tender Closing: June 22nd, 2018 @ 2:00PM.

Submitting Your Bid

If you'd like to submit a bid for this project, please send your proposal to dustin@canbian.com.

Closing Date

June 22, 2018

Download Asset Package

Royal Chapelle

Project Description

One Storey CRU building with associated site work. Mechanical and Electrical are design build and have been awarded. All other scopes are open to tender.
Please direct tender inquiries and send all quotations to Stacey Foster by emailing at stacey@canbian.com.

Tender Closing: December 13th, 2017 @ 2:00PM.

Submitting Your Bid

If you'd like to submit a bid for this project, please send your proposal to stacey@canbian.com.

Closing Date

December 13, 2017

Download Asset Package

Windermere Hotel & CRU

Project Description

** UPDATE, REVISED ISSUED FOR TENDER PLANS ARE INCLUDED IN THE DOWNLOAD ASSET PACKAGE. TENDER HAS BEEN EXTENDED TO JULY 5TH. THIS IS APPLICABLE TO THE FOLLOWING INTERIOR SCOPES OF WORK INCLUDING: MILLWORK, SOLID SURFACES, HMD/PSF’S, HARDWARE, WASHROOM ACCESSOREIES, PAINTING, FLOORING, WALL TILE, DRYWALL, AND GLAZING. NEW CLOSING DATE IS JULY 5TH @ 2:00PM **

Canbian has been retained to assist with the design and complete the construction for this project. The site is located at 3340 Allan Drive SW, Edmonton, AB.

The Hilton Hotel is 4 stories high, has a total of 92 guest rooms, and a total of 43,154ft2. Building composition is made up of screw piles and concrete grade beams which will support the building’s wood structure. Exterior finishes include EIFS, brick, AL13 panels, aluminum storefront glazing, and a TPO roof. Interior finishes include millwork, solid surfaces, drywall, tile, carpet, vinyl flooring, gypcrete, interior stone, misc. metal fabrications painting, wall covering, wood doors, hollow metal doors, pressed steel frames, hardware, washroom accessories, shower surrounds, window coverings, fireproofing, and spray foam insulation.

The CRU building is 2 stories high with a total of 11,963ft2 of floor area. Building composition is made up of screw piles and concrete grade beams which support it’s structural steel skeleton. Exterior finishes include EIFS, brick, aluminum storefront glazing, and a TPO roof. Interior finishes include millwork, drywall, tile, carpet, painting, hollow metal doors, pressed steel frames, hardware, washroom accessories, fireproofing, and spray foam insulation.

Site work scope to be tendered includes site concrete, asphalt paving, fencing, moloks, landscaping, & site furniture.

Construction is anticipated to commence July 2017 and be completed in January 2019. Please provide separate pricing for each building for accounting purposes.

The following scopes of work are already tendered and awarded: Excavation, piling, elevators, mechanical, site services and electrical.

Please direct tender inquiries and send all quotations to Mike Bianco by calling 780-489-1756 or emailing at mike@canbian.com.

Tender Closing: July 5th, 2017 @ 2:00PM.

Submitting Your Bid

If you'd like to submit a bid for this project, please send your proposal to mike@canbian.com.

Closing Date

July 5, 2017

Download Asset Package